Title
-
S5 - Estimate of Expense
£1.00
-
S3_Plans (A3) - Plans A3
The Plans show the centre lines and limits of deviation of the proposed works and define the land that may be acquired or used for the purposes of building and operating the railway. A description of the land, together with details of ownership, occupiers and those who have a legal interest in the land is included in the Book of Reference, information for which can be found under 'Book of Reference'. At the start of each Plans volume is a key plan, which relates each sheet of the Plans to a map of the proposed line of the railway. This key plan should be used to find particular locations you may be interested in.
£20.00 -
S3_Plans (A1) - Plans A1
The Plans show the centre lines and limits of deviation of the proposed works and define the land that may be acquired or used for the purposes of building and operating the railway. A description of the land, together with details of ownership, occupiers and those who have a legal interest in the land is included in the Book of Reference, information for which can be found under 'Book of Reference'. At the start of each Plans volume is a key plan, which relates each sheet of the Plans to a map of the proposed line of the railway. This key plan should be used to find particular locations you may be interested in.
£175.00
-
S3_Sections (A1) - Sections A1
The Sections show a section along the centre line of the proposed works illustrating the intended level of the works in relation to the existing ground and features. The vertical limits of deviation for the works provided for under the AP are by reference to the level of the work shown on the sections.
£130.00 -
S3_Sections (A3) - Sections A3
The Sections show a section along the centre line of the proposed works illustrating the intended level of the works in relation to the existing ground and features. The vertical limits of deviation for the works provided for under the AP are by reference to the level of the work shown on the sections.
£12.00
-
S4 - Book of Reference
£17.00
-
S6 - Housing Statement
£1.00
-
S7 - Non-technical summary
This document is a summary in non-technical language of the changes reported in the SES2 and amendments reported in the AP2 ES. It presents a summary of any likely residual significant effects on the environment, which are new or different to those reported in the main ES submitted to Parliament in January 2022 and SES1 and AP1 ES, deposited in July 2022 in support of the hybrid Bill for High Speed Rail (Crewe – Manchester), where relevant.
£3.50
-
S8 - Volume 1: Introduction and methodology
Volume 1 introduces the supplementary environmental information and changes to the design and construction assumptions included within SES2, and amendments which have resulted in the need to amend the Bill, which are reported within the AP2 ES. It also explains the environmental impact assessment process that has been applied.
£7.00 -
S9 - Glossary, abbreviations and references
The glossary of terms, list of abbreviations and references contain any terms and abbreviations used throughout the SES2 and AP2 ES.
£5.50
-
S11 - Volume 2 MA01: Hough to Walley's Green
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Hough to Walley’s Green area that are new or different to that reported in the main ES and SES1 and AP1 ES.
£7.50 -
S17 - Volume 2 Map Book MA01: Hough to Walley's Green
Contains a series of maps showing the SES2 design changes and AP2 ES amendments in MA01.
£8.00 -
S12 - Volume 2 MA02: Wimboldsley to Lostock Gralam
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Wimboldsley to Lostock Gralam area that are new or different to that reported in the main ES and SES1 and AP1 ES.
£7.50 -
S18 - Volume 2 Map Book MA02: Wimboldsley to Lostock Gralam
Contains a series of maps showing the SES2 design changes and AP2 amendments in MA02.
£8.00 -
S13 - Volume 2 MA03: Pickmere to Agden and Hulseheath
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Pickmere to Agden and Hulseheath area that are new or different to that reported in the main ES and SES1 and AP1 ES.
£7.50 -
S19 - Volume 2 Map Book MA03: Pickmere to Agden and Hulseheath
Contains a series of maps showing the SES2 design changes and AP2 amendments in MA03.
£8.00 -
S14 - Volume 2 MA06: Hulseheath to Manchester Airport
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Hulseheath to Manchester Airport area that are new or different to that reported in the main ES.
£7.50 -
S20 - Volume 2 Map Book MA06: Hulseheath to Manchester Airport
Contains a series of maps showing the SES2 design changes and AP2 amendments in MA06.
£8.00 -
S15 - Volume 2 MA07: Davenport Green to Ardwick
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Davenport Green to Ardwick area that are new or different to that reported in the main ES.
£7.50 -
S21 - Volume 2 Map Book MA07: Davenport Green to Ardwick
Contains a series of maps showing the SES2 design changes and AP2 amendments in MA07.
£8.00 -
S16 - Volume 2 MA08: Manchester Piccadilly Station
This report describes the supplementary environmental information and changes to the design and construction assumptions included within the SES2 (Part 1) and amendments included within the AP2 ES (Part 2). It includes any likely significant environmental effects arising from these changes and amendments in the Manchester Piccadilly Station area that are new or different to that reported in the main ES.
£7.50 -
S22 - Volume 2 Map Book MA08: Manchester Piccadilly Station
Contains a series of maps showing the SES2 design changes and AP2 amendments in MA08.
£8.00
-
S23 - Volume 3: Route-wide effects
This report describes the likely significant environmental effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2 for SES2 and AP2 ES.
£7.50
-
S24 - Volume 4: Off-route effects
Reports the likely significant environmental effects predicted to occur at locations beyond the HS2 railway between Crewe and Manchester.
£7.50 -
S25 - Volume 4: Off-route effects Map Book
Contains a series of maps relating to the off-route effects assessment.
£8.00
-
S26 - Agriculture, forestry and soils assessment (AG-001-00000)
This report details the changes to the assessment for agriculture, forestry and soils since the main ES and SES1 and AP1 ES comprising information on the assessment of effects on agricultural land and soils and the assessment of effects on farm holdings.
£6.00 -
S27 - Agriculture, forestry and soils Map Book (AG-01, AG-04)
Contains maps illustrating the agricultural holdings and agricultural land quality to support the SES2 changes and AP2 amendments
£16.00
-
S45 - Air quality – Technical note – Updated guidance on the assessment methodology for Phase 2b SES2 and AP2 ES (CT-001-00003)
This report provides further information on the assessment of air quality during construction and operation of HS2 Phase 2b Crewe – Manchester.
£4.00 -
S28 - MA01 Air quality report (AQ-001-0MA01)
This report details the changes to the assessment for air quality in MA01 since the main ES and SES1 and AP1 ES.
£4.00 -
S29 - MA02 Air quality report (AQ-001-0MA02)
This report details the changes to the assessment for air quality in MA02 since the main ES and SES1 and AP1 ES.
£6.50 -
S30 - MA03 Air quality report (AQ-001-0MA03)
This report details the changes to the assessment for air quality in MA03 since the main ES and SES1 and AP1 ES.
£10.00 -
S31 - MA06 Air quality report (AQ-001-0MA06)
This report details the changes to the assessment for air quality in MA06 since the main ES. This report also includes MA04 and MA05.
£19.00 -
S32 - MA07 Air quality report (AQ-001-0MA07)
This report details the changes to the assessment for air quality in MA07 since the main ES.
£13.50 -
S33 - MA08 Air quality report (AQ-001-0MA08)
This report details the changes to the assessment for air quality in MA08 since the main ES.
£19.00 -
S34 - Off-route works (Annandale depot) Air quality report (AQ-001-OR003)
This report details the changes to the assessment for air quality around the Annandale depot since the main ES.
£2.50 -
S35 - Air quality Map Book (AQ-01)
Contains maps showing air quality related features, construction activities and receptors used in the air quality assessments of the SES2 changes and AP2 amendments
£11.00
-
S43 - Summary greenhouse gas calculation inputs and outputs (CL-003-00000)
This report details the changes to the assessment for greenhouse gas (GHG) since the main ES and SES1 and AP1 ES.
£1.50
-
S44 - Community Map Book (CM-01)
Contains maps identifying community receptors along the route which have the potential to be significantly affected by the SES2 changes and AP2 amendments.
£13.00
-
S48 - Alternatives report (CT-003-00000)
This report outlines the alternatives to the SES2 changes and AP2 amendments.
£5.00 -
S49 - Planning data (CT-004-00000)
This report provides an update to the planning data and committed developments relevant to the SES2 and AP2 ES.
£8.00 -
S50 - Planning data – off-route works (CT-004-OR000)
This report provides an update to the planning data and committed developments relevant to the SES2 and AP2 ES.
£2.00 -
S51 - Planning Data / Committed Developments Map Book (CT-13)
Contains maps showing updated planning data on committed development and proposed development since the main ES and SES1 and AP1 ES.
£17.50 -
S52 - Wider effects report (CT-006-00000)
This report details the changes to the likely significant effects reported in SES2 and AP2 ES that may result if the scheme as built deviates from the centre line of the works within the limits of deviation, as permitted under parliamentary powers.
£2.50 -
S53 - Corrections to Volume 5 of the January 2022 Environmental Statement and the July 2022 Supplementary Environmental Statement 1 and Additional Provision 1 Environmental Statement (CT-009-00000)
This report details corrections to the Environmental Statement as published in January 2022 and the Supplementary Environmental Statement 1 and Additional Provision 1 Environmental Statement as published in July 2022.
£22.00
-
S54 - Ecological baseline data - designated sites (EC-001-00000)
This report provides details of the changes to nature conservation site designations since the main ES and SES1 and AP1 ES.
£2.00 -
S55 - Ecology and biodiversity Map Book – designated sites (EC-01)
Contains maps illustrating statutory and non-statutory designated sites for nature conservation, locations of Nature Reserves of the RSPB and Wildlife Trusts and ancient woodlands to support the SES2 changes and AP2 amendments.
£21.00 -
S60 - Ecological register of local level effects (EC-015-00000)
This report details new or different local/parish level adverse effects since the main ES and SES1 and AP1 ES.
£2.50 -
S61 - Designated site assessment for the Midland Meres and Mosses Phase 2 Ramsar site (Oak Mere) and Oak Mere Special Area of Conservation (EC-016-00001)
This report contains the background assessment of the Oak Mere Site of Special Interest (SSSI) component of the Midland Meres and Mossess Phase 2 Ramsar site and Oak Mere Special Area of Conservation (SAC) to be reported under the EIA Regulations 2017 (as amended).
£6.00 -
S62 - Designated site assessment for Manchester Mosses Special Area of Conservation (Holcroft Moss) (EC-016-00002)
This report contains the background assessment of the Holcroft Moss Site of Special Scientific Interest (SSSI) component of the Manchester Mosses Special Area of Conservation (SAC) to be reported under the EIA Regulations 2017 (as amended).
£9.50 -
S63 - Designated site assessment for Rostherne Mere Ramsar site and Midland Meres and Mosses Phase 1 Ramsar site (The Mere, Mere) (EC-016-00003)
This report contains the background assessment of the Rostherne Mere Ramsar site and the Mere, Mere Site of Special Scientific Interest (SSSI) component of the Midland Meres and Mosses Phase 1 Ramsar site to be reported under the EIA Regulations 2017 (as amended).
£16.50 -
S64 - Designated site assessment for Rochdale Canal Special Area of Conservation (EC-016-00004)
This report contains the background assessment of the Rochdale Canal Special Area of Conservation (SAC) to be reported under the EIA Regulations 2017 (as amended).
£10.00 -
S65 - Designated site assessment for Rixton Clay Pits Special Area of Conservation (EC-016-00005)
This report contains the background assessment of the Rixton Clay Pits Special Area of Conservation (SAC) to be reported under the EIA Regulations 2017 (as amended).
£6.00 -
S66 - Designated site assessment for the Midland Meres and Mosses Phase 2 Ramsar site (Oakhanger Moss) (EC-016-00006)
This report contains the background assessment of the Oakhanger Moss Site of Special Scientific Interest (SSSI) component of the Midland Meres and Mosses Phase 2 Ramsar site to be reported under the EIA Regulations 2017 (as amended).
£7.00 -
S67 - Designated site assessment for the Midland Meres and Mosses Phase 1 Ramsar site (Tatton Meres) (EC-016-00007)
This report contains the background assessment of the Tatton Meres Site of Special Scientific Interest (SSSI) component of the Midland Meres and Mosses Phase 1 Ramsar site to be reported under the EIA Regulations 2017 (as amended).
£6.50 -
S68 - Designated site assessment for the Midland Meres and Mosses Phase 1 Ramsar site and the West Midland Mosses Special Area of Conservation (Wybunbury Moss) (EC-016-00009)
This report contains the background assessment of the Wybunbury Moss Site of Special Scientific Interest (SSSI) component of the West Midland Mosses Special Area of Conservation (SAC) and Midland Meres and Mosses Phase 1 Ramsar site to be reported under the EIA Regulations 2017 (as amended).
£6.00
-
S71 - Affected receptors within 50m of railway and associated risks and mitigation (EM-001-00000)
This report provides details of changes to the EMI assessment as a result of the SES2 changes and AP2 amendments.
£11.50
-
S73 - Summary gazetteer, impact assessment table and historic landscape character areas (HE-002-00000)
This report provides an update to the historic environment assessment as a result of the SES2 changes and AP2 amendments.
£12.50 -
S74 - Historic environment Map Book (HE-01, HE-02)
Contains maps showing updated designated and non-designated assets required during the construction of the scheme since the main ES and SES1 and AP1 ES.
£20.00
-
S76 - Land quality report (LQ-001-00000)
This report provides details of the changes to the land quality assessment as a result of the SES2 changes and AP2 amendments.
£4.00 -
S77 - Land quality report: Off-route works (Annandale depot) (LQ-001-OR003)
This report provides details of the changes to the off-route land quality assessment at Annandale depot as a result of the SES2 changes and AP2 amendments.
£2.50 -
S78 - Land quality Map Book (LQ-01)
Contains maps showing potential sources of existing contamination, historical and operational landfill sites, current and potential future mining/mineral exploitation and geoconservation sites.
£12.00
-
S81 - MA01 Landscape and visual impact assessment and photomontages (LV-001-0MA01)
This report provides details of the changes to the landscape and visual assessment for MA01 as a result of the SES2 changes and AP2 amendments.
£6.00 -
S82 - MA02 Landscape and visual impact assessment and photomontages (LV-001-0MA02)
This report provides details of the changes to the landscape and visual assessment for MA02 as a result of the SES2 changes and AP2 amendments.
£5.50 -
S83 - MA03 Landscape and visual impact assessment and photomontages (LV-001-0MA03)
This report provides details of the changes to the landscape and visual assessment for MA03 as a result of the SES2 changes and AP2 amendments.
£5.50 -
S84 - MA06 Landscape and visual impact assessment and photomontages (LV-001-0MA06)
This report provides details of the changes to the landscape and visual assessment for MA06 as a result of the SES2 changes and AP2 amendments.
£31.00 -
S85 - MA07 Landscape and visual impact assessment and photomontages (LV-001-0MA07)
This report provides details of the changes to the landscape and visual assessment for MA07 as a result of the SES2 changes and AP2 amendments.
£17.00 -
S86 - MA08 Landscape and visual impact assessment and photomontages (LV-001-0MA08)
This report provides details of the changes to the landscape and visual assessment for MA08 as a result of the SES2 changes and AP2 amendments.
£9.00 -
S87 - Landscape and visual Map Book (LV-00, LV-02, LV-07, LV-08, LV-17)
Contains maps showing landscape context, landscape character areas, zones of theoretical visibility and viewpoint locations associated with the SES2 changes and AP2 amendments.
£25.00
-
S88 - Major accidents and disasters risk screening (MA-001-00000)
This report provides details of the changes to the major accidents and disasters assessment as a result of the SES2 changes and AP2 amendments.
£5.00
-
S90 - Updated socio-economics baseline information (SE-001-00000)
This report provides details of changes to the socio-economics baseline data since the main ES.
£4.00 -
S91 - Updated socio-economics baseline information: Off-route works (SE-001-0R000)
This report provides details of changes to the off-route socio-economics baseline data since the main ES.
£2.00 -
S92 - Socio-economics Map Book (SE-01)
Contains maps identifying updated effects on socio-economic resources as a result of the SES2 changes and AP2 amendments and those unchanged or removed from the scheme deposited in the main ES and SES1 and AP1 ES.
£11.00
-
S93 - Baseline and construction sound, noise and vibration report (SV-002-00000)
This report provides details of changes to the baseline and construction sound, noise and vibration assessment as a result of the SES2 changes and AP2 amendments.
£23.00 -
S94 - Operational sound, noise and vibration report (SV-003-00000)
This report provides details of changes to the operational sound, noise and vibration assessment as a result of the SES2 changes and AP2 amendments.
£4.50 -
S95 - Sound, noise and vibration Map Book (SV-02, SV-03, SV-08, SV-09)
Contains maps that support the assessment of significant noise and vibration effects as a result of the SES2 changes and AP2 amendments.
£25.00
-
S46 - Traffic and transport – Technical note – Updated guidance on significance criteria for traffic and transport (CT-001-00004)
This report provides further guidance to that contained in the HS2 Phase 2b Environmental Impact Assessment Scope and Methodology Report on how traffic and transport effects will be determined.
£5.00 -
S96 - Transport Assessment Part 1 Addendum (TR-001-00000)
This report provides an update to the Transport Assessment introduction sections as a result of the SES2 changes and AP2 amendments.
£3.00 -
S97 - MA01 Transport Assessment Part 2 Addendum (TR-002-00001)
This report provides an update of the overview of the existing and forecast future baseline conditions in MA01, the transport infrastructure and operations that could potentially be affected by the changes relevant to traffic and transport as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments.
£15.00 -
S98 - MA02 Transport Assessment Part 2 Addendum (TR-002-00002)
This report provides an update of the overview of the existing and forecast future baseline conditions in MA02, the transport infrastructure and operations that could potentially be affected by the changes relevant to traffic and transport as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments.
£25.00 -
S99 - MA03 Transport Assessment Part 2 Addendum (TR-002-00003)
This report provides an update of the overview of the existing and forecast future baseline conditions in MA03, the transport infrastructure and operations that could potentially be affected by the changes relevant to traffic and transport as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments.
£10.00 -
S100_A - MA06-MA08 Transport Assessment Part 2 Addendum (TR-002-00006) Report 1 of 7
This report provides an update of the overview of the existing and forecast future baseline conditions in MA06, MA07 and MA08 (including MA04), the transport infrastructure and operations that could potentially be affected by the changes relevant to traffic and transport as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 1 of 7 includes MA04.
£6.00 -
S100_B - MA06-MA08 Transport Assessment Part 2 Addendum (TR-002-00006) Report 2 of 7
This report provides an update of the overview of the existing and forecast future baseline conditions in MA06, MA07 and MA08 (including MA05), the transport infrastructure and operations that could potentially be affected by the changes relevant to traffic and transport as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 2 of 7 includes MA05.
£7.50 -
S101_A - MA01 Transport Assessment Part 3 Addendum (TR-003-00001) Report 1 of 2
This report provides an update to the assessment of transport impacts in the MA01 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 1 of 2 includes construction impacts.
£23.00 -
S101_B - MA01 Transport Assessment Part 3 Addendum (TR-003-00001) Report 2 of 2
This report provides an update to the assessment of transport impacts in the MA01 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 2 of 2 includes operational impacts.
£1.00 -
S102_A - MA02 Transport Assessment Part 3 Addendum (TR-003-00002) Report 1 of 2
This report provides an update to the assessment of transport impacts in the MA02 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 1 of 2 includes construction impacts.
£30.50 -
S102_B - MA02 Transport Assessment Part 3 Addendum (TR-003-00002) Report 2 of 2
This report provides an update to the assessment of transport impacts in the MA02 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 2 of 2 includes operational impacts.
£20.00 -
S103_A - MA03 Transport Assessment Part 3 Addendum (TR-003-00003) Report 1 of 2
This report provides an update to the assessment of transport impacts in the MA03 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 1 of 2 includes construction impacts.
£21.00 -
S103_B - MA03 Transport Assessment Part 3 Addendum (TR-003-00003) Report 2 of 2
This report provides an update to the assessment of transport impacts in the MA03 area, including construction traffic of the AP2 revised scheme which includes the SES2 changes and AP2 amendments. Report 2 of 2 includes operational impacts.
£10.00 -
S104_A - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 1 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 1 of 12 includes an assessment of construction impacts in MA04.
£2.00 -
S104_B - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 2 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 2 of 12 includes an assessment of construction impacts in MA05.
£6.00 -
S104_C - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 3 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 3 of 12 includes an assessment of impacts in MA06-MA08.
£29.00 -
S104_D - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 4 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 4 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£18.50 -
S104_E - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 5 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 5 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£27.00 -
S104_F - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 6 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 6 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£34.00 -
S104_G - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 7 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 7 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£3.00 -
S104_H - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 8 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 8 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£21.00 -
S104_I - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 9 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 9 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£15.00 -
S104_J - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 10 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 10 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£19.00 -
S104_K - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 11 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 11 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£31.00 -
S104_L - MA06-MA08 Transport Assessment Part 3 Addendum (TR-003-00006) Report 12 of 12
This report provides an update to the assessment of transport impacts in the MA06-MA08 area, including construction traffic, of the AP2 revised scheme that includes the SES2 changes and AP2 amendments. Report 12 of 12 includes an assessment of impacts in MA06-MA08 (continued).
£3.00 -
S106 - Transport Assessment Part 4 Addendum (TR-005-00000)
This report provides an overview of the route-wide traffic and transport impacts for the AP2 revised scheme (that includes the SES2 changes and AP2 amendments) in construction.
£47.00 -
S107 - Traffic and transport Map Book (TR-01, TR-03, TR-04, TR-08)
Contains maps showing updates to significant residual transport effects from HS2 Phase 2b Crewe – Manchester and construction routes to the strategic network as a result of the AP2 revised scheme that includes the SES2 changes and AP2 amendments.
£76.00
-
S47 - Water resources and flood risk – Technical note – Updated guidance on flood risk assessment (CT-001-00005)
This report provides further information on the assessment of flood risk during construction and operation of HS2 Phase 2b Crewe – Manchester.
£2.00 -
S108-A - Water Framework Directive compliance assessment addendum (WR-001-00000)
This report provides an update to the Water Framework Directive compliance assessment as a result of the SES2 changes and AP2 amendments.
£5.00 -
S108-B - Water Framework Directive compliance assessment addendum (WR-001-00000)
This report provides an update to the Water Framework Directive compliance assessment as a result of the SES2 changes and AP2 amendments.
£300.00 -
S109 - Water Framework Directive preliminary compliance assessment addendum: Off-route works - Annandale depot (WR-001-OR003)
This report provides an update to the Water Framework Directive compliance assessment for Annandale depot as a result of the SES2 changes and AP2 amendments.
£2.00 -
S112 - Combined effects of changes and amendments in the MA01-MA03 areas due to changes in construction traffic flows (WR-003-00000)
This report provides details of changes to the water resources assessment in MA01-MA03 as a result of changes in construction traffic flows.
£4.00 -
S113 - MA06 Water resources assessment (WR-003-0MA06)
This report provides an update to existing water resources in MA06 as a result of the SES2 changes and AP2 amendments.
£11.50 -
S114 - MA07 Water resources assessment (WR-003-0MA07)
This report provides an update to existing water resources in MA07 as a result of the SES2 changes and AP2 amendments.
£4.00 -
S115 - MA08 Water resources assessment (WR-003-0MA08)
This report provides an update to existing water resources in MA08 as a result of the SES2 changes and AP2 amendments.
£3.00 -
S117 - MA06 Flood risk assessment (WR-005-0MA06)
This report provides an update to existing flood risks in MA06 as a result of the SES2 changes and AP2 amendments.
£5.00 -
S118 - MA07 Flood risk assessment (WR-005-0MA07)
This report provides an update to existing flood risks in MA07 as a result of the SES2 changes and AP2 amendments.
£5.00 -
S119 - MA08 Flood risk assessment (WR-005-0MA08)
This report provides an update to existing flood risks in MA08 as a result of the SES2 changes and AP2 amendments.
£2.00 -
S120 - Hydraulic modelling report - River Medlock (WR-006-00008)
This reports provides an update to the hydraulic modelling undertaken for the River Medlock since the production of the main ES.
£4.00 -
S121 - Hydraulic modelling report - River Mersey (WR-006-00009)
This reports provides an update to the hydraulic modelling undertaken for the River Mersey since the production of the main ES.
£10.50 -
S122 - Hydraulic modelling report - Tributaries of Birkin Brook (WR-006-00010)
This report provides the results of the hydraulic modelling undertaken for the Tributaries of Birkin Brook.
£4.00 -
S123 - Hydraulic modelling report - River Bollin (WR-006-00011)
This report provides the results of the hydraulic modelling undertaken for the River Bollin.
£4.00 -
S124 - Water resources and flood risk Map Book (WR-01, WR-03, WR-05, WR-06)
Contains maps showing updates to water resources and flood risk baseline date since the main ES.
£26.00
-
S36 - MA01 Additional data used in the air quality assessment (BID AQ-002-0MA01 SES2 and AP2 ES)
£4.00 -
S37 - MA02 Additional data used in the air quality assessment (BID AQ-002-0MA02 SES2 and AP2 ES)
£7.00 -
S38 - MA03 Additional data used in the air quality assessment (BID AQ-002-0MA03 SES2 and AP2 ES)
£5.00 -
S39 - MA06 Additional data used in the air quality assessment (BID AQ-002-0MA06 SES2 and AP2 ES)
£11.50 -
S40 - MA07 Additional data used in the air quality assessment (BID AQ-002-0MA07 SES2 and AP2 ES)
£7.00 -
S41 - MA08 Additional data used in the air quality assessment (BID AQ-002-0MA08 SES2 and AP2 ES)
£9.50 -
S42 - Off-route works - Annandale depot: Additional data used in the air quality assessment (BID AQ-002-OR003 SES2 and AP2 ES)
£1.50
-
S56 - Ecological baseline data – amphibians (BID EC-007-00000 SES2 and AP2 ES)
£10.00 -
S57 - Ecological baseline data – bats (BID EC-011-00000 SES2 and AP2 ES)
£16.00 -
S59 - Ecological baseline data – other (BID EC-017-00000 SES2 and AP2 ES)
£16.00 -
S69_A - Ecology Map Book (EC-02, EC-04, EC-05, EC-06, EC-08, EC-10, EC-11, EC-12) - Part 1
£38.00 -
S69_B - Ecology Map Book (EC-02, EC-04, EC-05, EC-06, EC-08, EC-10, EC-11, EC-12) - Part 2
£35.00
-
S72 - Historic environment baseline data (BID HE-001-00000 SES2 and AP2 ES)
£11.50 -
S75 - Historic environment field survey report (BID HE-004-00000 SES2 and AP2 ES)
£7.00
-
S79 - Land quality baseline data (BID LQ-002-00000 SES2 and AP2 ES)
£4.00 -
S80 - Off-route works - Annandale depot: Land quality baseline data (BID LQ-002-OR003 SES2 and AP2 ES)
£3.00
-
S110 - Water Framework Directive compliance assessment baseline data (BID WR-002-00001 SES2 and AP2 ES) - Part 1
£17.00 -
S111 - Water Framework Directive compliance assessment baseline data (BID WR-002-00001 SES2 and AP2 ES) - Part 2
£19.00 -
S116 - MA06 Water resources assessment baseline data (BID WR-004-0MA06 SES2 and AP2 ES)
£1.50
-
S125 - House of Commons Leaflet - Petitioning Guidance
A guide to petitioning against the Additional Provision if you are specially and directly affected.
£1.00 -
S126 - Guide to the SES2 and AP2
A guide to the structure and content of the Supplementary Environmental Statement 2, Additional Provision 2 and Additional Provision 2 Environmental Statement for HS2 Phase 2b Crewe – Manchester.
£1.00